Zambia Consolidated Copper Mines Limited,
Nkana Division, Zambia  

Picture

Multiple Positions - 1982 - 1989

PictureNkana No 2 Cobalt Plant before wet commissioning - 1982
Positions held:
Assistant Superintendent – Technical – Copper Smelter     1989
smelter using reverberatory furnaces and peirce-smith converters
  • Responsible for trial work; the training of 1,150 employees and metallurgical & financial accounting.
  • Improved acid gas capture efficiency by over 10% despite the system being in a poor state of repair and budget constraints.
Plant Metallurgist – Acid Plants                                 1986 – 1989
complex of 4 sulphuric acid plants using plant offgas for acid production
Senior Supervisory post with responsibilities that included:
  • Initiation and control of day-to-day testwork and plant troubleshooting.
  • Supervision, development and motivation of both technical and non technical staff.
  • Plant Accounting – financial & metallurgical – budget preparation and cost control.
Major Projects/Achievements:
  • On my own initiative - with a fair degree of departmental latitude - I identified, tested and implemented various import substitutions which had the capacity to embedded savings of over >$US500,000 each year in foreign exchange. The most important of these was the local manufacture of saddles and other acid plant ceramics by a sanitary ware manufacturer.
  • I set up and ran an Acid Transport scheduling system that, at a time of increasing transport constraints, greatly reduced consumer plant outages due to the non-availability of acid.
Cobalt Plant
fluid bed roast / acid leach (with thickeners and filtration) / electrowin (both copper and cobalt tankhouses) 220 tpm cobalt plant

Senior Metallurgist - Cobalt Plant & Acting Plant Metallurgist - Cobalt Plant                              
1984 – 1986
Responsible, at various times, for the operational control of a Fluid Bed Roaster, three Copper Electrowinning Tankhouses, one Cobalt Electrowinning Tankhouse as well as leaching and filtration sections.

Junior Metallurgist - Cobalt Plant                                         
1982 – 1984
Entry-level position on the Commissioning team for the new 220 Tonne per month Cobalt Plant. I worked shifts for 17 months performing process control and training plant operators on each equipment unit as we commissioned it.

I came off shifts to take my turn performing metallurgical accounting and would have been one of the last (before PCs) to carry it out by hand calculation.
​